Charlotte Pipe & Foundry Company PVC 00100 Schedule 40 PVC/ DWV Pipe Coupling View larger

Charlotte Pipe & Foundry Company

Charlotte Pipe & Foundry Company PVC 00100 Schedule 40 PVC/ DWV Pipe Coupling

Item is normally in stock and ships out within 3-5 Business days (excluding transit time). If out of stock it can take up to 2-4 weeks (excluding transit time).Specific options may or may not increase shipping time. For any reason, if there is a delay in shipping time we will notify you. Feel free to contact us if you have any concerns.

$3.99

Details: Charlotte Pipe & Foundry Company PVC 00100 Schedule 40 PVC/ DWV Pipe Coupling

PVC fittings are intended for drain, waste and vent purposes. They are used in gravity-fed waste elimination systems and are for non-pressure systems where temperatures will not exceed 140 Degree F. PVC is lightweight and easy to install.

Features

  • Conforms to meet Standards ASTM D 1784, ASTM D 2665, ASTM D 3311 and NSF 14.
  • White fittings used in sanitary drain, waste, and vent (DWV), sewer and storm drainage applications.
  • Not intended for pressure use.
  • Maximum working temperature of 140 degrees Fahrenheit.
  • Requires no special tools for cutting and to be installed with solvent cement.

Specifications

Weight
0.090000
UPC
00611942031887
Package Width
1.97
Package Length
1.97
Package HWeight
1.62

Applications

  • Public Buildings & Facilities
  • Commercial & Industrial Buildings
  • Government & Military Facilities
  • Retail & Strip Malls
  • Multifamily & Mixed-Use

Reviews

Write a review

Charlotte Pipe & Foundry Company PVC 00100 Schedule 40 PVC/ DWV Pipe Coupling

Charlotte Pipe & Foundry Company PVC 00100 Schedule 40 PVC/ DWV Pipe Coupling

More products from this category